According to research from the Better Data Center Project, Anthropic’s U.S. data centers are projected to draw approximately 87% of their power from gas and 11% from coal in 2028, with virtually no grid renewables attributed to the company’s power use.

The analysis examined Anthropic’s compute commitments and associated power generation infrastructure. As of October 2026, Anthropic had contracted 15 GW of compute capacity, with approximately 5.9 to 9.6 GW assigned to specific U.S. data center sites. According to the report, this scale of demand—equivalent to powering about 7 million homes or covering 18% of California’s peak power demand—will be met primarily through new on-site gas generation, new grid gas plants, and existing grid fossil and nuclear capacity.
The report identified that Anthropic “recently bought commitments for 1.7 gigawatts of heavy-duty [gas] generators for $3.4bn.” Although Anthropic has stated it is “working to broaden our energy mix with geothermal, wind, solar, and emerging technologies,” the analysis found that the company’s only publicly disclosed renewable energy commitments, contracts, or investments are located in Norway and Canada as of November 2026.
Estimated CO2 emissions from Anthropic’s power use at these sites could reach 17 to 38 million metric tons CO2 equivalent annually in 2028, with a midpoint estimate of 32 million MtCO2e. The report notes this could exceed California’s entire power generation emissions (31.1 MMtCO2e in 2024) and surpass the combined Scope 2 emissions from Meta, Microsoft, and Google in 2025.
The analysis also found that approximately 25% (2.5 GW) of Anthropic’s contracted power will come from on-site gas generation, with 80% of this capacity consisting of inefficient simple cycle turbines and engines. The report identified concerns regarding specific facilities: Anthropic uses compute capacity at SpaceX’s Colossus 2 facility, which still receives most power from temporary, unpermitted turbines lacking emissions control technology, and has contracted 460 MW from Nscale’s Monarch Compute Campus in West Virginia, powered by reciprocating engines with significant air pollutant emissions.
Key facts
- Anthropic’s U.S. data centers expected to be powered 87% by gas and 11% by coal in 2028
- As of October 2026, Anthropic had contracted approximately 5.9-9.6 GW at specific U.S. data center sites
- Company recently purchased $3.4 billion in commitments for 1.7 gigawatts of heavy-duty gas generators
- Estimated 2028 CO2 emissions from Anthropic’s power use: 17-38 million MtCO2e annually (midpoint 32 MMtCO2e)
- 80% of Anthropic’s on-site gas capacity uses inefficient simple cycle turbines and engines
- Anthropic’s renewable energy commitments in U.S. are absent; only investments in Norway and Canada disclosed
- Average carbon intensity of Anthropic’s power estimated at 1,033-1,076 lb CO2e/MWh, 35% higher than U.S. grid average